Previous:previous post all posts Next:previous post

Industrial Office Mezzanine Floor Transforms Operations

Thistle Systems has enabled a major energy company to transform its performance at a major power station with the installation of a mezzanine floor featuring an industrial office which has centralised its Maintenance Team Leaders.

Thistle Systems

Thistle Systems

Thistle Systems

Industrial mezzanine with office

Thistle Systems were able to create an open plan office environment to accommodate 21 members of staff, who could communicate and work together far more efficiently and effectively.

Thistle designed, manufactured installed the mezzanine floor before carrying out the complete office fit out including securing the building warrant, carrying out the full mechanical and electrical works as well as supplying the office furniture.

Thistle also created two new doorways by knocking through 400mm thick engineering bricks and installing the necessary structural lintels conforming to the necessary building regulations.
Thistle also created a high value storage facility below the mezzanine floor which was split in 3 segregated areas to provide separate storage facilities for the electrical and mechanical teams plus a general secure storage facility.

What we did

  • Open plan office created to accommodate 21 members of staffOpen plan office created to accommodate 21 members of staff
  • Designed, manufactured and installed mezzanine floor, completed office fit out, secured building warrant, carried out full mechanical and electrical works and also installed office furnitureDesigned, manufactured and installed mezzanine floor, completed office fit out, secured building warrant, carried out full mechanical and electrical works and also installed office furniture
  • Created high value storage facility Created high value storage facility

Solutions Used

Related case studies

View some of our other case studies showing a selection of our best work across a range of sectors and spaces.