One of Scotland’s leading food and drink companies has transformed the capacity and efficiency of their Engineering Store thanks to the high density two-tier Picking Tower designed, supplied and installed by Thistle Systems.

Thistle Systems

164%

Increase

in total storage capacity

Thistle Systems

248%

Increase

in Small parts storage capacity

Thistle Systems

39%

Increase

In Large Storage Capacity

High Density Picking Tower

One of Scotland’s leading food and drink companies has transformed the capacity and efficiency of their Engineering Store thanks to the two-tier high-density Picking Tower designed, supplied and installed by Thistle Systems.

Like many food and drink companies, the parts storage in the warehouse had grown organically over time and featured a combination of cabinets, steel shelving and pallet racking as well as a bespoke fabrication to store small bars.

However, with space becoming an issue, the company brought in Thistle Systems to discuss the option of a mezzanine floor to capitalise on the available height, however it quickly became apparent it was not the optimum solution.

The initial survey demonstrated the existing system provided 110 linear metres of small parts storage and 36 linear metres of large parts storage in the 54 square metres of floor space.

However, the survey also identified a real issue when it came to finding and picking parts.

Thistle designed and delivered a unique, high density Picking Tower which provided 383 linear metres of small parts storage and 50 linear metres of large parts storage – almost treble the previous capacity.

The solution used a combination of pallet racking with chipboard decks to accommodate the large and heavy components such as machinery parts and heavy duty shelving to accommodate the smaller components.

The use of pallet racking in a picking tower required a bespoke engineering solution to enable additional small parts storage to be provided above.

A key focus of the project was to increase capacity and organisation of the small parts which could feature anything from brackets and bolts to collars and coils.

Thistle designed a series of small parts areas with dividers and bin fronts to transform capacity whilst also ensuring that really small components were stored safely

And thanks to Thistle Systems’ full design and deliver service, which assumed full responsibility for achieving compliance with the latest building standards, the client was able to enjoy complete peace of mind from the turnkey approach.

To find out more or discuss your project contact us now on 01236 453888 or visit https://thistlesystems.co.uk/casestudies/picking-tower/

What we did

  • Storage capacity Increased from 164 linear metres to 433 linear metres Storage capacity Increased from 164 linear metres to 433 linear metres
  • 164% Increase in same floor space of 54 square metres164% Increase in same floor space of 54 square metres
  • 383 linear metres of small parts storage383 linear metres of small parts storage
  • 50 linear metres of large parts storage 50 linear metres of large parts storage
  • Heavy-duty racking integrated into picking tower for large components Heavy-duty racking integrated into picking tower for large components
  • Small parts storage optimised with dividers and bin frontsSmall parts storage optimised with dividers and bin fronts