Industrial Mezzanine Floor With Offices

Previous:previous post all posts Next:previous post

Industrial Mezzanine Floor

Thistle Systems has enabled a major energy company to transform its performance at a major power station with the installation of an industrial mezzanine floor featuring an office which has centralised its Maintenance Team Leaders.

Thistle Systems

21

Personnel

Accommodated in Industrial Mezzanine with Offices

Thistle Systems

3

Secure Storage Areas

to store high value goods and enquipment

Thistle Systems

2

Fire Escape Stairs

Industrial mezzanine with office

Thistle Systems were able to create an open plan office environment to accommodate 21 members of staff, who could communicate and work together far more efficiently and effectively with the design and installation of the industrial mezzanine floor. Thistle also completed the full office fit out including securing the building warrant, carrying out the full mechanical and electrical works and supplying the office furniture.

Thistle also created two new doorways by knocking through 400mm thick engineering bricks and installing the necessary structural lintels conforming to the necessary building regulations.

Thistle also created a high value storage facility below the mezzanine floor which was split in 3 segregated areas to provide separate storage facilities for the electrical and mechanical teams plus a general secure storage facility.

A key element of the project was developing a works programme which minimised the disruption to the operations. Thistle Systems ability to deliver the full works package which included the design and installation of the mezzanine floor, the high value storage and the associated interior fit out works, was instrumental to ensuring all aspects were successfully co-ordinated and completed on time. Click here to find out more about mezzanine costs

Secure Storage Below Industrial Mezzanine Floor
Industrial Mezzanine Floor with Offices

What we did

  • Open plan office created to accommodate 21 members of staffOpen plan office created to accommodate 21 members of staff
  • Designed, manufactured and installed mezzanine floor, completed office fit out, secured building warrant, carried out full mechanical and electrical works and also installed office furnitureDesigned, manufactured and installed mezzanine floor, completed office fit out, secured building warrant, carried out full mechanical and electrical works and also installed office furniture
  • Created high value storage facility Created high value storage facility