Two Tier Floor Aberdeen Engineering Store

Previous:previous post all posts Next:previous post

Thistle Systems has used its Max the Cube approach to transform the capacity and efficiency of an engineering store for an Aberdeen Oil Supplier with the installation of a two tier shelving system, on top of an existing concrete mezzanine floor.

Thistle Systems

130%

Capacity Increase

Thistle Systems

48

bays to ground floor with 6 shelves

Thistle Systems

44

bays to first floor with 5 shelves

Two Tier Shelving for Oil Giant

After carrying out a full site survey, Thistle proposed a two tier shelving solution to maximise the available height in the building, dramatically increase capacity by 130% and improve picking times.

The nature of the existing mezzanine meant that the two tier had to be installed with absolute precision to ensure the loading capacity didn’t compromise the structural integrity of the offices below but thanks to Thistle’s design expertise and consulting with specialist structural engineers, this wasn’t a problem.

As part of the project, Thistle installed a combination of mesh panelling and full steel panelling as well as carrying out the installation of all lighting and the external staircase to provide access to the top tier. Thistle also carried out the necessary design and submission works to obtain the building warrant and to ensure the two tier complied with the latest building regulations.

What we did

  • Increased capacity by 130%Increased capacity by 130%
  • Shelving was set to accommodate small parts containers for maximum efficiency and capacityShelving was set to accommodate small parts containers for maximum efficiency and capacity
  • Secure storage with lockable mesh installed Secure storage with lockable mesh installed
  • 48 bays to ground floor with 6 shelves48 bays to ground floor with 6 shelves
  • 44 bays to first floor with 5 shelves44 bays to first floor with 5 shelves
  • Obtained the building warrant and to ensure the two tier complied with the latest building regulationsObtained the building warrant and to ensure the two tier complied with the latest building regulations