CASE STUDIES

A SELECTION OF OUR BEST WORK ACROSS A RANGE OF SECTORS AND SPACES.

Case study

Dry Goods Storage Doubled With Mezzanine Floor

A leading food and drinks company has doubled the storage capacity within their dry goods storage area thanks to a 20 metre by 9.6 metre mezzanine floor.

Case study

Bespoke Shelving Solution for Global Oil and Gas Giant

Thistle Systems have enabled one of the world’s leading suppliers to the oil and gas industry to increase the size and security measures in a key storage facility in Aberdeen by developing a bespoke storage solution with a custom designed shelving solution.

Case study

Mezzanine Doubles Work Space for Packaging Team

Thistle Systems has enabled one of Scotland’s leading drinks manufacturers to double their existing work area by designing and delivering a major mezzanine floor.

Case study

High-Density Drive-In Racking Installed for Global Independent Bottler

Thistle Systems has recently installed its high-density Maxi Cube Drive-In Racking and adjustable pallet racking (APR) into the warehouse of one of the world’s largest independent bottlers.

Case study

Office Mezzanine for Food and Drink Company

Thistle Systems has enabled a food and drink company to accommodate its rapid growth by designing and installing a mezzanine floor within the production space to create office space for up to 12 employees with secure storage space below.

Case study

Maxi Cube Push Back IBC Racking Transforms Space Utilisation

Thistle Systems has enabled a major drinks company to dramatically reduce the floor space required to store its IBCs, as well as improving the safety, by designing, supplying and installing a specialist IBC push back racking system.

Case study

Two Tier Racking Transforms Capacity Of Parts Storage in Aberdeen.

Maximised capacity of car garage by developing a two tier flooring system with bespoke shelving solution

Case study

Locker Room Fit Out Reduces Energy By Over 80% 

Thistle Systems has completed a fit out of a locker room and toilet facility for one of the UK’s leading re-manufacturers of engines where they upgraded 4 washrooms and 2 locker rooms.

Case study

Mezzanine Floor to Facilitate New Production Area in Glasgow

High specification mezzanine floor designed to free up valuable production space and create area for buffer stock

Case study

Push Back Racking For Major Food Manufacturer

Thistle Systems has installed high density push back racking for a major food manufacturer to allow for a new production line

Case study

Office Mezzanine Floors Dundee Media Company

Thistle Systems has successfully installed mezzanine floor offices for the quay side headquarters of a fast growing Dundee media company thanks to its Max the Cube philosophy

Case study

Dynamic Racking Quadruples Storage Capacity

Thistle Systems increased capacity by installing a dynamic storage solution using high density pallet live racking.

Case study

Industrial Mezzanine Floor With Offices

Thistle Systems has enabled a major energy company to transform its performance at a major power station with the installation of an industrial mezzanine floor featuring an office which has centralised its Maintenance Team Leaders.

Case study

Premium Production Area For Major Drinks Company

Thistle Systems creates dedicated bottling and packaging area for premium products.

Case study

High Density Storage to Create Additional Production Space

Thistle Systems has enabled one of the world’s leading manufacturers of gauges and valves to improve their storage system by installing high density storage.

Case study

Push Back Racking For Aberdeen Drinks Manufacturer

Thistle Systems installs one of the largest continuous blocks of push back racking in its history for a major drinks producer

Case study

Medical Device Manufacturer Dramatically Increases Storage Capacity

Thistle Systems has dramatically increased the warehouse capacity of one of the world’s leading Medical Device manufacturers

Case study

Mobile Workstations, Industrial Shelving And High Density Drawers, Glasgow.

Thistle Systems has delivered the workshop design and storage requirements for a specialist supplier of industrial air compressors and pneumatic tools.

Case study

Mesh Cages Create Secure Storage for Specialist Contractor

Thistle Systems has enabled a specialist contractor in the energy sector to improve the efficiency of their workplace by using their Max the Cube approach

Case study

Mezzanine Floors Maximise Capacity For Livingston Food Company

Thistle Systems transforms the despatch area capacity of a specialised food company

Case study

High Density Parts Storage For Porsche, Aberdeen.

Thistle Systems install high density storage for a new Porsche dealership in Aberdeen

Case study

Mezzanine Floor Glasgow

Thistle Systems' have designed and installed a mezzanine floor for a leading health product supplier, able to withstand heavy machinery

Case study

Parts Storage Solution for BMW

When it comes to design and engineering, very few companies can compete with BMW. So when the German manufacturing giant were looking to design their parts store for their flagship showroom and workshop in Edinburgh, BMW turned to Thistle Systems to advise on creating a storage facility that would enhance the performance of the operation.

Maximise your space.

Our max the cube approach enables you to maximise the capacity within your facilities whilst dramatically reducing your operational costs.

Trusted by these organisations