A leading food and drinks company has doubled the storage capacity within their dry goods storage area thanks to a 20 metre by 9.6 metre mezzanine floor.
Thistle Systems has demonstrated its expertise in designing and installing mezzanine floors by overcoming the challenge of installing a small project with underfloor heating in the existing concrete slab.
Thistle Systems’ Max the Cube approach has enabled one of the UK’s leading refrigeration and air conditioning wholesalers to double their storage capacity withing their existing facility whilst ensuring they comply with the latest HSE requirements.
Thistle Systems has demonstrated its expertise in mezzanine floors by creating an office mezzanine for one of the world’s most prestigious textile manufacturers.
Thistle Systems has enabled one of Scotland’s leading drinks manufacturers to double their existing work area by designing and delivering a major mezzanine floor.
Thistle Systems has enabled one of the UK’s leading specialist Automotive Parts Suppliers to transform the capacity in their Scottish warehouse with a Mezzanine Floor which allowed them to double the available storage space.
Thistle Systems has enabled a food and drink company to accommodate its rapid growth by designing and installing a mezzanine floor within the production space to create office space for up to 12 employees with secure storage space below.
Thistle Systems has enabled one of the country’s leading fruit merchant to double its storage capacity and provide the space to install a cold store facility by designing, supplying installing a mezzanine floor.
Thistle Systems has recently enabled a major Scottish food distributor to treble the office space within an existing warehouse facility with zero impact on storage capacity by designing and installing a mezzanine floor office.
High specification mezzanine floor designed to free up valuable production space and create area for buffer stock
A specialist solutions provider in the construction industry has seen its storage capacity increased by as much as 183% thanks to Thistle Systems’ Max the Cube approach.
Thistle delivered a warehouse mezzanine floor which would allow 2 metre pallets to be stored above with additional pallets below
Thistle Systems has successfully installed mezzanine floor offices for the quay side headquarters of a fast growing Dundee media company thanks to its Max the Cube philosophy
Thistle Systems has enabled a major energy company to transform its performance at a major power station with the installation of an industrial mezzanine floor featuring an office which has centralised its Maintenance Team Leaders.
Thistle Systems enabled a specialist equipment supplier to the oil & gas industry to maximise storage space in their existing facility.
Thistle Systems has dramatically increased the warehouse capacity of one of the world’s leading Medical Device manufacturers
Thistle Systems transforms the despatch area capacity of a specialised food company
Thistle Systems' have designed and installed a mezzanine floor for a leading health product supplier, able to withstand heavy machinery
Our max the cube approach enables you to maximise the capacity within your facilities whilst dramatically reducing your operational costs.
Discover the key benefits of shuttle racking and why companies are now switching from other systems
Read moreAutomated Racking Solutions can deliver a number of significant benefits; however, the one thing that gets people turned on to the concept is how much additional capacity it can deliver.
Read moreOur Max the Cube approach looks at space utilisation slightly differently and focuses on cubic volumes rather than pallet positions used.
Read more